The plot was determined by a curving street, enjoying a wide view of the nearby mountains. In it there were several trees and rocks, so the building was, on the one hand, an opportunity to develop a project that played with the distant landscape of the Sierra de Madrid and the nearby one, of the plot itself and its pre-existing nature and, on the other hand, a challenge, to try to avoid cutting ..